EVS Saar - Sewage Treatment Works - Perl-Besch

Design capacity: 23.000 HV

Dry weather flow:

5.410 m³/d


Wastewater treatment:


  • Mechanical pre-treatment
  • Aerobic biological preparation
       with SBR - process
  • Strorage of Sludge and
       Sludge dehydration


  • Type of Advertisment:

    Product mix


    Production costs:

    7.638.330,-


    Construction period:

    2007 - 2009


    Size of order elementis consult:



    Part VII HOAI: engineering work
  • Standard benefits
    • 2- 5, 8, 9
  • Extra benefits
    • Attendance of the initial operation

    Amount of work elementis consult:


    Part VII HOAI: engineering work


    Order sum elementis consult:

    358.000,-


    Processing period:

    2005 – 2010