Abwasserzweckverband Promnitztal - Sewage Treatment Works Radeburg

Design capacity: 20.000 HV

Dry weather flow:

4.000 m³/d

Saisonal campaign operation:

Tourism of Moritzburg


Wastewater treatment:


  • Mechanical pre-treatment
  • Aerobic simultaneous stabilizing
       biological preparation with SBR process
  • Sludge treatment and
        Sludge dehydration


  • Type of Advertisment:

    Product mix


    Production costs:

    5.092.000,-


    Construction period:

    2004 - 2005


    Size of order elementis consult:



    Part VII HOAI: engineering work
  • Standard benefits
    • 1 – 9
  • Extra benefits
    • Regional construction monitoring § 57 HOAI
    Order sum elementis consult:

    430.000,-


    Processing period:

    2000 – 2009/12