EVS Saar - Sewage Treatment Works - Überherrn

Design capacity: 18.000 HV

Dry weather flow:

4.320 m³/d


Wastewater treatment:


  • Mechanical pre-treatment
  • Aerobic simultaneous stabilizing
       biological preparation with SBR process
  • Sludge treatment and
        Sludge dehydration


  • Type of Advertisment:

    Product mix


    Production costs:

    7.666.120,-


    Construction period:

    2005 - 2007


    Size of order elementis consult:



    Part VII HOAI: engineering work
  • Standard benefits
    • 1- 4, 6, 7, 9
  • Extra benefits
    • Regional construction monitoring § 57 HOAI

    Part IX HOAI: technichal equipment
  • Standard benefits
    • 1- 4, 7- 9


    Part II HOAI: Open Space Planning
  • Standard benefits
    • 1- 4, 7- 9


    Amount of work elementis consult:


    Part VII HOAI: engineering work


    Order sum elementis consult:

    330.000,-


    Processing period:

    1991 – 2011